White and one

White coffee and one sugar seems to be the go with the tradies ☺

It was a busy and productive week with things being gradually ticked off the list inside and outside of the house.

The damaged ceiling has been patched in the study but still needs to be sanded back and painted. I am really hoping this is going to happen this week so we can get this room unpacked and sorted out. We are now into week 6 of living here so I think we have been pretty patient with this!!

Study ceiling
Study ceiling

We had the glass splashback people back to finish off beading the edges – some of the splashbacks had been done and others left – uuuum it really does make me wonder what they are thinking when they do this sort of thing.

The shutters were installed and I had them look at some of our curtains which had dropped a bit too much – these were adjusted and are now looking good.

UF living room shutters
UF living room shutters

The landscapers have been busy – the wooden screen was extended to completely  screen the shed (it was a little low the first time).

Shed screening
Shed screening

The guys also finished off the bluestone paving around the sides of the house, front verge and garden bed borders.

Front verge paving
Front verge paving
Eastern side access paving
Eastern side access paving
Paving to edge garden beds
Paving to edge garden beds

They installed the reticulation pipes and have prepped the ground for lawn which I think is being laid tomorrow  yay ☺😊😊

Laying reticulation
Laying reticulation
Ready for lawn
Ready for lawn
Grass, what no grass
Grass, what no grass

I am sooooooo excited about having grass and plants this week ☺

Leave a comment